Model | Screw dia (mm) | width (mm) | Thickness(mm) | Total power (KW) | Output (kg/h) | Foaming times | Dimension(m) | Weight |
EFP-75 | 75 | 850~1700 | 0.2-3 | 55 | 25-50 | 9-64 | 20*4*3 | 4T |
EFP-90 | 90 | 850~1700 | 0.2-4 | 75 | 60-90 | 22*4*3 | 5T | |
EFP-105 | 105 | 850~1700 | 0.3-6.5 | 95 | 80-120 | 25*4*3 | 5.5T | |
EFP-120 | 120 | 850~1700 | 0.5-8 | 115 | 120-180 | 27*4*3 | 6T | |
EFP-135 | 135 | 850~1700 | 1-10 | 150 | 170-220 | 35*4*3 | 7.5T | |
EFP-150 | 150 | 850~1700 | 2-12 | 220 | 250-300 | 38*7*3 | 10T | |
EFP-170 | 170 | 850~1700 | 2-14 | 320 | 100-450 | 40*7*3 | 12T | |
EFP-180 | 180 | 850~2200 | 3-16 | 330 | 300-500 | 41*7*3 | 13T | |
EFP-200 | 200 | 850~2200 | 3-25 | 400 | 350-650 | 42*7*3 | 14T | |
EFP-220 | 220 | 850~2200 | 3-27 | 450 | 400-700 | 43*7*3 | 15.5T | |
EFP-250 | 250 | 850~2200 | 3-30 | 500 | 450-800 | 46*7*3 | 17T |
EPE Foam sheet making machine(Expanded polyethylene foam machine) is mainly used in the production of EPE sheet. After melting the LDPE resin mixed with butane gas, talcum powder, shrink resistant agent and other agent, products foaming simultaneously extruding through the die head and lip. Then products is expanded, pulled and winded as a roller.
By subscribing to our mailing list you will always be updated with the latest news from us.
Q: Where is your factory located? How can I visit there?
A: Our factory is located in Laizhou city, Shandong province, you can fly to Yantai or Qingdao airport, Yantai airport is nearer
than Qingdao airport.When you confirm flight No. and time, please feel free to contact us, then we will pick up you on time.
Q: Why you choose our EPE foam sheet making machine(expanded polyethylene foam machine)?
A:1,Our company have mademachine forabout 20 years with strong experience and advanced technology.
2,we are factory direct sale ,provide you Best Quality and Service with Reasonable price.
Q: What's the trade term and payement term?
A: 30% or 50% T/T before production; Paid in full before shipment.
Q: Will you send the equipment to us directly after completion
A: After the completion of the equipment,you must first come to the acceptance,confirm that there is no problem before delivery